• norsk
    • English
  • norsk 
    • norsk
    • English
  • Logg inn
Vis innførsel 
  •   Hjem
  • Norges miljø- og biovitenskapelige universitet
  • Faculty of Science and Technology (RealTek)
  • Master's theses (RealTek)
  • Vis innførsel
  •   Hjem
  • Norges miljø- og biovitenskapelige universitet
  • Faculty of Science and Technology (RealTek)
  • Master's theses (RealTek)
  • Vis innførsel
JavaScript is disabled for your browser. Some features of this site may not work without it.

En evaluering av passasjerutviklingen forårsaket av NSBs ruteplanendring i 2012/2015

Stigen, Torbjørn Aasen
Master thesis
Thumbnail
Åpne
Stigen_2016_final_msc.pdf (5.337Mb)
Permanent lenke
http://hdl.handle.net/11250/2402448
Utgivelsesdato
2016-08-29
Metadata
Vis full innførsel
Samlinger
  • Master's theses (RealTek) [2009]
Sammendrag
Offentlige infrastrukturprosjekter krever enorme ressursinnsatser og har som formål å

forbedre landets trafikktilbud. Tross prosjektenes ressurstyngde presiserer tidligere

studier at evalueringer av prosjektenes faktiske nytteeffekter er mangelvare (Flyvbjerg

et al. 2005; Nicolaisen & Driscoll 2014; Pickrell 1990). Studiene oppfordrer til videre

utførelser av effektevalueringer for å etablere et solid empirisk fundament rundt temaet.

Trafikkprognoser er en hjørnestein i ex ante evalueringer av prosjekters nytteverdi og

har stor påvirkning for hvilke prosjekter som realiseres. En rød tråd fra tidligere

forskning er at jernbanerelaterte trafikkprognoser virker å være overestimerte, noe som

gir et feilaktig bilde av nytte-kostnad forholdet ved hvert enkelt prosjekt (Flyvbjerg et al.

2005; Nicolaisen & Driscoll 2014; Pickrell 1990).

Den faktiske nytten av jernbaneprosjekter synliggjøres gjennom en mer attraktiv

ruteplan med eksempelvis hyppigere avganger og kortere reisetider. Denne oppgavens

formål har vært å evaluere effekten en større ruteendring har hatt for Østlandets

passasjerutvikling. Endringen ble gjennomførbar i forbindelse med ferdigstillelse av nytt

dobbeltspor mellom Asker og Lysaker. Ruteendringen er blitt gradvis implementert av

NSB i 2012 og 2015 (NSB 2011).

For å utføre nødvendig analyser er det benyttet multippel lineær regresjon med hensikt

om å estimere sammenhengen mellom forklaringsvariabler tilknyttet ruteendringen og

passasjerutviklingen. Det er utført analyser med ulike antakelser om til hvilke

tidspunkter nytten ved forbedret ruteplan realiseres.

Oppgavens resultater viser signifikante sammenhenger på 90 % nivå mellom

passasjerutvikling og avgangsfrekvens, reisetid og befolkningsvekst. Effekten av ny

ruteplan viser seg å være generelt høyere enn trafikkprognosenes beregninger.

Resultatene varierer mye under hvilke antakelser analysen er basert på. Oppgavens

resultater viser at ruteplanens effekt er høyere under antakelse om en gradvis

effektrealisering enn ved umiddelbar effektrealisering. Dette indikerer at det finnes en

treghet i markedets respons på tilbudsendringer.
 
Public infrastructure projects aim to improve the public transport system, but require

enormous sums of money from taxpayers. Despite the projects´ huge resource

allocation, previous studies mention limited knowledge of the true effects of

infrastructure projects (Flyvbjerg et al. 2005; Nicolaisen & Driscoll 2014; Pickrell 1990).

Therefore, these studies recommend future ex-post evaluations of infrastructure

projects to establish more empirical knowledge within the field. Demand forecasts are a

cornerstone for the cost - benefit analysis of infrastructure projects and play an

important role in the final choice of a project alternative. A general perception is that

railway-related demand forecasts tend to be overestimated which gives an optimistic

picture of the cost -benefit relationship (Flyvbjerg et al. 2005; Nicolaisen & Driscoll

2014; Pickrell 1990).

For railway projects, the effect of infrastructure improvements gets realized through

improved timetables (higher train frequencies, reduced travel time etc.). The purpose of

this thesis is to evaluate the effects on the passenger demand caused by a major

timetable change. A new double-track section between Asker and Lysaker made the

change possible, and it was gradually implemented in 2012 and 2015 (NSB 2011).

Multiple linear regression is used to estimate the relationship between passenger

demand development and the explanatory variables linked to the timetable change. The

thesis is based on several analyses with different assumptions of when the true effects of

the change are realised.

The results show, with 90 % significance, a relationship between passenger demand and

train frequency, travel time and population growth. The effect of the timetable change

proves to be generally higher than assumed in demand forecasts, but with varying

results for the different analyses. Generally, the results indicate higher effects of the

timetable change under the assumption of a delayed realization of the effects compared

to immediate realization. This indicates that the market responds gradually to changes.
 
Utgiver
Norwegian University of Life Sciences, Ås

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit
 

 

Bla i

Hele arkivetDelarkiv og samlingerUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifterDenne samlingenUtgivelsesdatoForfattereTitlerEmneordDokumenttyperTidsskrifter

Min side

Logg inn

Statistikk

Besøksstatistikk

Kontakt oss | Gi tilbakemelding

Personvernerklæring
DSpace software copyright © 2002-2019  DuraSpace

Levert av  Unit